Summary
Flexibility and Demand-Response procedures. Drives the 33 DR procedures in T4-4_02 and the FCA-aligned procedures.
Cross-border test cases
| Pair | Strength | Owner | Notes |
|---|---|---|---|
| flexgrid ↔ INTERFLEX | 1 | TBD | Both T4.4 flexibility |
Flexibility and Demand-Response procedures. Drives the 33 DR procedures in T4-4_02 and the FCA-aligned procedures.
| Pair | Strength | Owner | Notes |
|---|---|---|---|
| flexgrid ↔ INTERFLEX | 1 | TBD | Both T4.4 flexibility |
| Pilot | S1 | S2 | S3 | S4 | S5 | S6 | S7 | S8 | DCI | Cross-border |
|---|---|---|---|---|---|---|---|---|---|---|
| Cuerva's Living Lab | 0 | 2 | 0 | 2 | 2 | 2 | 0 | 0 | 0 | none |
| Jenny+ | 0 | 2 | 0 | 2 | 2 | 2 | 0 | 2 | 0 | planned |
| SP–Dataspace Connection Adapter | 2 | 2 | 2 | 2 | 0 | 2 | 0 | 2 | 0 | planned |
| ARE (RomeFlex) | 0 | 3 | 3 | 3 | 0 | 3 | 0 | 0 | 0 | none |
| flexgrid | 0 | 2 | 0 | 2 | 2 | 2 | 0 | 2 | 0 | none |
| PVflex | 0 | 2 | 2 | 2 | 2 | 2 | 0 | 0 | 0 | none |
| Metering Point Effectiveness (MPE) | 0 | 2 | 2 | 0 | 0 | 2 | 0 | 0 | 0 | none |